European Wax Center

Baton Rouge, LA

This project started with an empty shell and went from the rough-in construction phase all the way to final completion with furniture and fixtures installed and ready to open for business. At the outset, the suite was approximately 1200 sq. ft of retail storefront. We added an entry retail lobby, private clinic rooms, a single ADA restroom, and a storage area. We provided the supervisor and labor along with highly skilled subcontracted technicians to bring the project to successful completion on time.

This project started with an empty shell and went from the rough-in construction phase all the way to final completion with furniture and fixtures installed and ready to open for business. At the outset, the suite was approximately 1200 sq. ft of retail storefront. We added an entry retail lobby, private clinic rooms, a single ADA restroom, and a storage area. We provided the supervisor and labor along with highly skilled subcontracted technicians to bring the project to successful completion on time.

Condition of Property

  • We started with an empty shell and went for the rough-in construction phase all the way to final completion with furniture and fixtures installed and ready to open for business.

Cost

  • The cost of construction to complete the suite for the interior build-out was approximately $250,000, which included a budget increase for a better-performing air conditioning system. Our HVAC experts determined the need to keep the temperature consistent throughout the suite due to the specific requirements of the wax product. Failure to do so could have been extremely costly in the long run.
  • Budgetary Cost of Design & Engineering: Did not disclose
  • Tenant improvement Dollars towards the cost of Construction: Did not disclose.

timeframe

Time of construction
4th Quarter 2022
duration of construction
90 days
timeframe disclaimer
Timeframe of Design & Engineering: 8-10 weeks. Work began in Late Dec. 2021